Saturday, April 1, 2023

March Operating Session

 March was the first session with the ABS signals running.

We found more than a few issues, but overall the system functioned.

This time, I did snap a few more photos than February, but I spent a bunch of time walking around and troubleshooting signals, so photos were a low priority.

Crew (from the book):

Bob S

Keith P

Dick M

Mike P

John V

Bryce

Scott


Engineer Bryce getting an Amtrak regional parked in the northern staging.

Bob (foreground) and Keith (background) running.

John has just left the North Acca Control Point on his way over the railroad with what looks like a local.

A few more shots can be found at richmond-terminal.org.

Another created in November, backdated post.