List of work from Op Session Number 1

During the operating session in December, a list of not functional items was captured.

The next couple of blog posts are going to be about the various rework efforts so I wanted to set the stage for why certain tasks were done.

  • Track curvature to/from staging on North End of railroad too sharp; Amfleet cars rub
  • Track not level to/from staging on North End; apparent hump in homasote
  • Track curvature to/from staging on Doswell branch too sharp
  • Staging ladder on North End power issues
  • Staging ladder on North End track gauge issues
  • Staging ladder on Doswell branch power issues
  • Some cars are missing Kadee couplers
  • Missing feeders between Hamilton and XP control points
  • Martin Marrietta spur; switch needs rework as it won't completely throw
  • N. Doswell cross over has feeder on flange side of rail
  • S. Milford industrial track missing feeders; totally dead rail
  • Frog power needed on staging ladders
  • Frog power needed on mail line cross overs
  • UP5 needed at staging yard throats
  • Tortoises need power/control connections
  • Potential Loconet issues
There were a couple of bad order cars that were removed, but that isn't something outside the norm from an operating session.