The railroad is maturing, which is giving me a chance to go back and install signals in areas that haven't been a priority, or to rework an area where the original signal install isn't reflective of how that area should be setup.
One of these locations that needed a net new install is the industrial turnout in Greendale, between the GN control point, and the Glen Allen (GA) control point.
There is a fair amount of industrial spots in this area, and both main lines have turnouts in place. I needed dwarf signals to protect these turnouts. One of them is currently manually thrown with a ground throw, so that will need to be modified to be thrown via a switch machine first, before signals get installed.
For the turnout that is currently controlled by a button (and will be controlled by the dispatcher in the future), I built a coulple of dwarfs and installed them.
I also took this opportunity to cut away a bunch of cork roadbed, and make the area look more realistic from a lineside perspective.
I had planned for a set of intermediate (repeater) signals between North Doswell and South Milford. This is matched up with Rutherglen on the prototype.
These are NJ International signals, with snow hoods. I will need to put something on the fascia in this area, since it can be hard to see these from the aisleway.
A spot that needed to be reworked is inside Doswell towards the north end.
At the turnout that branches into track 4 from track 3, I originally had 2 high signals in this area. As I needed to only protect the turnout state, and not give advancement permission, I built and installed two dwarfs in their place.
![]() |
The high signal in the background is for traffic that will be using the crossover, northbound, and getting clearance to enter the RF&P mainline |
More pictures can be found in the gallery at richmond-terminal.org
No comments:
Post a Comment