Wednesday, September 18, 2019

2nd Bridge Start

As I've mentioned, I need 3 different bridges in place to complete the layout benchwork for the upper level.

The 2nd bridge spans the entryway into the room so it was the next to be tackled.

Initial build with yellow highlights placed.
The needed span was pretty long at around 80", but as it was straight, this was the next one to tackle. As we had rebuild the landing zones previously, the only additional thing to do was to put the yellow caution paint in place.

And yes, it is yellow on both sides.
Dad convinced me it needed more contrast to be more obviously apparent that it was installed, so some black paint was found and applied.

Shot from the stairs - this is a very nice visual when you come down the stairs.

More shots on the main gallery site: richmond-terminal.org

No comments:

Post a Comment