Saturday, September 28, 2019

Roadbed Redux

Working the area around the 3rd bridge, which is the Doswell Wye area, found that either I mis-measured or the roadbed crew was a bit over eager during installation as the roadbed as installed would cause the curves on both sides of Doswell to be out of wack.

So, out comes the oscillating tool with the scraper blade and up comes the cork.



No comments:

Post a Comment