Friday, September 27, 2019

Warning, Helix Approaching

Before construction of the 2nd bridge, we realized that we would need to know how the tracks leaving the helix would interact with the track on the upper level.

We started to measure and eventually came to the conclusion that the benchwork that supported the helix would need to be lowered by a bit.


First step was to take the plywood subroadbed off and then lower and level the structure.


Of course, I had a bit of help, which I always appreciate.

One to drill and one to fasten makes the work goes fast.
Bryce rolling brown down.

No comments:

Post a Comment