Finished up benchwork for the main and lower levels this past weekend.
The helix will be getting finished up and the other half of the yard (industry, storage and coach yard) and start doing some testing.
Operations in May.
Wednesday, March 30, 2011
Tuesday, March 8, 2011
Progress Update XVII
Over the last 2 weeks and change, have just done a couple of things, as the next big part requires more benchwork and I am trying to stop creating so much sawdust in the basement.
Industry tracks in:
Main to yard crossover installed and connected:
Put your turnouts down and measure at least 3 times before you go and drill holes for turnout controls..
Industry tracks in:
Main to yard crossover installed and connected:
Put your turnouts down and measure at least 3 times before you go and drill holes for turnout controls..
Well...