Over the last 2 weeks and change, have just done a couple of things, as the next big part requires more benchwork and I am trying to stop creating so much sawdust in the basement.
Industry tracks in:
Main to yard crossover installed and connected:
Put your turnouts down and measure at least 3 times before you go and drill holes for turnout controls..
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment