March was the first session with the ABS signals running.
We found more than a few issues, but overall the system functioned.
This time, I did snap a few more photos than February, but I spent a bunch of time walking around and troubleshooting signals, so photos were a low priority.
Crew (from the book):
Bob S
Keith P
Dick M
Mike P
John V
Bryce
Scott
Engineer Bryce getting an Amtrak regional parked in the northern staging. |
Bob (foreground) and Keith (background) running. |
John has just left the North Acca Control Point on his way over the railroad with what looks like a local. |
A few more shots can be found at richmond-terminal.org.
Another created in November, backdated post.