Thursday, August 9, 2018

Benchwork Getting Closer

The upper level benchwork is now about 95% complete.

The only major components pending at this point are the lift bridges to be placed and that's more a case of assembling and testing versus having to make sawdust fly.

I've got to paint before roadbed and then track goes down, but that's quick work that can be done during an evening window.

Mostly finished product.


This high POV shot is taken from the doorway.
I need to remember to blank the door blinds as all that light makes this angle a challenge.

And we will finish up on the other side of the railroad; this is approaching the Hamilton Control Point.
Note the backdrop curve.


As always, more shots at the website gallery.

No comments:

Post a Comment