Saturday, July 17, 2021

Subroadbed Complete to North Acca

 Benchwork and subroad have been completed into North Acca. On the RF&P, this was control point NA.


I've gone back to 3/4" ply on the lower level. This plywood is a really nice 6 ply option that I sourced at Home Depot in 2020 before the great wood debacle of 2021.


More shots are in the gallery at richmond-terminal.org

No comments:

Post a Comment