Wednesday, February 21, 2018

Work Session Recap

I had a work session on last Saturday (the 10th). I was joined by Dick M who joined the Terminal's track gang for an afternoon.

Track was started between the Milford and North Doswell Control Points. We ran track over the completed roadbed, headed north.

Pictures are a mix from the self timer and my budding miniature photog.



Your intrepid small shooter found the supervisor asleep:



Working around the first turn back corner. This is a shot with the timer with the camera on a tripod on top of the benchwork opposite where we are working.


When we got track around this side, we realized that the curves weren't laid out correctly and checking with a radius gauge revealed the benchwork missed the target. I took it as an action item to rework this area.

Additional pictures inside the main site gallery: richmond-terminal.org

No comments:

Post a Comment