Had to build a number 6 for some industrial trackage.
Thursday, April 1, 2021
Wednesday, March 31, 2021
Manufactured Variance
I've mentioned this on the blog and site before, but there is variance in manufactured products.
Homasote seems to be a constant repeat offender.
Ladies and gentlemen of the jury, I present exhibit #1 for the prosecution:
A different view of this exhibit:
This shows about 15 or 20 minutes work with surform rasps and coarse sandpaper.
As homasote is a paper based product, dust is absolutely retched.
The prosecution rests.
Tuesday, March 30, 2021
More Power!
Had to start getting ready to install the LED lights for the lower level so a +12V supply was called for.
Monday, March 29, 2021
Quick Real Time Update
Benchwork is getting close to North Acca; placing homasote and will have it ready to paint fairly soon.
Got bored and reworked the DCC circuit breaker installation
My original install of the PSX breakers wasn't neat, but speedy.
Now with some time in the evening and having the lower level DCC wiring starting soon, I thought it was time to neat up the wallfield area where the command station is.
Much neater, I'd say!
Sunday, March 28, 2021
PCB Signal Mounting Update
Monday, March 1, 2021
Greendale Control Point Status
Building crossovers with the Fast Tracks jigs requires a certain order of operations.
I build each component turnout of the crossover, using the outside (non-frog connected) stock rail and points first. Then I will install the frog, of which, one leg of is the stock rail for the other turnout in the pair.
Once you have that, you can square the turnouts up, notch the stock rail (if you didn't measure it correctly first OR if you haven't notched it already) for the points and then finish your soldering job.
During the build, I realized that I had to build the LH crossover with a RH turnout immediately following the crossover to get to the Amtrak station. My first set of partials didn't have a long enough stock rail.
Oops.
I had to recut points and frogs and restart the build.
Building complex trackwork like this will make you wish you could buy ME rail in lengths longer than 3'; I could use 6' or longer pieces without issue.