| The high signal in the background is for traffic that will be using the crossover, northbound, and getting clearance to enter the RF&P mainline |
Wednesday, January 31, 2024
Signal Reworking
Tuesday, January 30, 2024
January Operations - A Famous Photographer Visits
During the January operating session, the Richmond Terminal hosted a (in)famous model railroad photographer, Wayland Moore.
Your layout host is always busy during a session and finds it difficult to take a bunch of quality photos, but having a visiting shutterbug was amazing.
Here are but a sampling of shots from Wayland.
| Engineer Dan Moore inspects his train at North Acca prior to departure, looking to make sure his paperwork matches. |
It would be impossible to show all the great shots he took without making this blog entry extremely long, so I will pick a couple that stood out to me.
| Road freight goes by the new Intermediate signal installation at Rutherglen. Photo by Wayland Moore. |
I appreciate that many of the shots showed trains going by signals. Management puts a significant amount of effort into the signalling system.
| Traffic manager discusses the yard at the start of the session. |
A shot that never occurred to me - the ready engine tracks.
A highlight for many that I've never captured - the food!
| The crew debriefs after the session, while enjoying desert. |
More photos from O. Wayland Moore can be found at richmond-terminal.org
Monday, January 29, 2024
January Op Session
The January 2024 Operating Session is in the books.
One major failure occurred, a single rear end collision. Many HO scale passengers were injured when their cars rolled over.
The engineer didn't seem upset.
Root cause was determined to be a signalling system failure where a clear aspect was given due to a occupied block not being checked.
A tragedy, and management regrets the incident.
Besides the one lamentable incident, the session proceeded well. All trains were run and a good time was enjoyed by all.
Keep your eyes open for the next session invite for February 2024.
More photos can be found at richmond-terminal.org
Monday, January 8, 2024
Reworking Block Detection for Signals
The Richmond Terminal is a signaled railroad. The end goal is to have a functional CTC system in place like version 1 did. Version 1 used a virtual CTC panel based on the Union Switch and Signal components inside JMRI.
As we are still working on the operating scheme, I decided that an Automatic Block System (ABS) would make the most sense to implement at the start and once the operating scheme was solidified, I would pivot to setting up the CTC system.
ABS is currently running based on the LogixNG inside JMRI. As I have worked through the configuration, I realized that when I connected the track blocks, I erred.
The Richmond Terminal is a 2 track mainline railroad, which means there are crossover from one track to another. These crossovers are frequent. The railroad is just shy of 10 scale miles; there are 14 crossovers total.
I setup 1 detection section per crossover. This meant a couple of things - detection of the crossover section would prevent a dispatcher from throwing one under a train, but the detection state would not help me drop to red until a train moved through the crossover and hit the next block, and I could not test the crossover occupancy to set a signal aspect, either.
Consider this example - a train is southbound on track 3, approaching a crossover. On track 2, a northbound train is moving through a crossover section, on a straight route. The crossover shows occupied, which is true for track 2, but NOT track 3.
This meant that I needed to go back and break apart the detection for each crossover and connect my blocks so that each component turnout of the crossover was detected separately.
I took advantage of this and did some rationalization of my DCC bus as well.
That's wire I pulled out from a part of 1 peninsula...
Here is a shot where I shortened bus wire and soldered new ends on. Had to clamp up a piece of plywood to give myself a working surface.
More pictures are in the gallery at richmond-terminal.org
Saturday, January 6, 2024
Protecting the fragile stuff
Thursday, January 4, 2024
Sunday, December 31, 2023
December Op Session
The December operating session went well, but it highlighted an issue with how I have done DCC block detection on the railroad.
We had 10 operators join us for the session and we were able to complete the entire schedule of trains for the first time ever.
| The yard crew chats. |
| Engineer Mike is working crossroads. You can see the very nice RF&P power on his train. |
| Engineer Bryce is getting ready for a run while the traffic manager gets paperwork ready. |